
Stretching for cleanliness...

Front porch getting poured

Randy Turner, our General Contractor, is the guy manning the float on the back patio. This is the area outside the master bedroom.

The concrete pumper truck has to reach over the entire house to get to the back patio!

Mrs. Builder celebrating in the soaker tub with the first bag of popcorn from our new microwave.

This mess of wires, copper tubing, and sheet metal is the heart and soul of the geothermal heat pump, where water is heated for the radiant floor heat and domestic hot water.

FINISHED!!! The first shower tiling project is officially done. WOO-HOO!

Kitchen with most of the appliances, sinks, faucets, etc. A bit messy yet, but not for long...

Here is a look out the french doors (with freshly painted trim) at the back yard.

Our lovely double-french doors into the "TV room/exercise room"

A view out the master bedroom's patio access. Note the new fencing being installed in the back yard - that is to contain our two new dogs! (pictures coming soon to a blog near you...)

Easter Sunday: for us, a day of new carpet. Here is one of the kid's bedrooms. The carpet is "Palomino Hills" color. Uh, yeah...

Mr. Builder vacuuming the master bedroom. Note the grubby clothes, the sign of a home owner who fancies himself a builder.
3 comments:
You guys rock. I can't wait to see it in person!
-- Sean
Two new dogs? Oh my! Can't wait to see it with real fixtures and all...too bad we're going opposite directions this weekend.
Carrie
Two new dogs? What happened to Tessie?
Your house looks very well designed for a lifetime of comfort for you both.
Best wishes,
Mom and Dad
Post a Comment